Boyum IT Solutions A/S

Netronic Manufacturing: Inspect

Allocation Management for Material Release


Date and time

Wednesday
17
December
16:00 CET
​​​​​​​​​​​​​​​​​​​​​Confirm sign-up
 Get inside the new feature for Inspect, "controlling item availability", and learn how to move material to a blocked location before the inspection, release them for further processing after or prepare the disposal and transfer the items to a scrap location when the quality check failed.

Let's take a look at the agenda:
  • Importance of controlling item availability in a quality-managed environment: Controlling item availability is essential in any quality-managed environment. In the past, SAP only allowed batch blocking, which made this level of control fairly limited.​​​​​​​
  • Warehouse Release Feature OverviewBoyum’s Warehouse Release feature changes that by enabling you to manage item availability independently of the item’s management method—while still working with standard SAP material transactions.
  • Process Walkthroughs - explore how this feature works: move materials to a blocked location before inspection, release them for further processing afterward, or route failed items for disposal by transferring them to a scrap location.
  • Q&A / Discussion 
Speaker

Julian Sondermann
Solution Advisor, Boyum IT


Duration
1 hour

Share this webinar